Buildings & Civil tenders in Nhai Hq
57 open buildings & civil tenders in Nhai Hq, the next closing 17 Sep 2026, 53 of them over ₹1 Cr. Updated every day.
Open all 57 in the search →Part of Nhai Hq. Every listing below is buildings & civil work only.
Open tenders
Operation and Maintenance of Four Laning work from Hiran River to Sindoor River from Km.66.00 to 130.00 (Excluding Nauradehi Wildlife) section of NH-12 (New NH-
Balance work of 4L of Haridwar Nagina Sec of EUP Mitigation Measures on NH74 from Km 13.829 to Km 17.110 n Km 26.077 to Km 27.508 And DC RME from Km 13.839 to K
Development/upgradation of existing 4 lane to 6 lane of Lucknow Sitapur section km 412.745 to km 479.327 (Length 66.582 km) of new NH30 in the State of Uttar Pr
Construction of Viaducts at 12 locations Cut and cover Tunnel at 02 locations and Pedestrian Underpass (PUP) at 01 location from Km 517.250 to Km 547.080 sectio
Construction of 4 L of Ujjain Jhalawar Sec of NH 552G from Ch.0.000 Village Khilchipura to Ch.86.500 Village Aakli Kadiya (PKG 1) in the State of Madhya Pradesh
Construction of 4L of Ujjain Jhalawar Sec of NH 552G from Ch.86.500 Aakli Kadiya to Ch.159.263 Jhalawar (Jn with NH52) PKG 2 in the State of Madhya Pradesh and
Consultancy Services for AE for Supervision of Construction of 4-Lanning of Ujjain-Jhalawar Section of NH-552G from Ch.0.000 Village Khilchipura to Ch.86.500 Vi
Closes 21 Sep 2026Portal ↗
Consultancy Services for AE for Supervision of Construction of 4-Lanning of Ujjain-Jhalawar Section of NH-552G from Ch.86.500 Village Aakli-Kadiya to Ch.159.263
Closes 21 Sep 2026Portal ↗
Balance work for Const of Western Side Spur of Rampur Rudrapur sec connecting NH24 to NH 87 bypassing Rampur Town at Risk and Cost of Contractor on EPC Mode in
Authority Engineer Services for Construction of De Scoped Length of Four Lane Bypass (NH 206) for Shivamogga City Project Length 4.74 Km from Km.209.76 to Km.21
Closes 22 Sep 2026Portal ↗
Upgrad of exist. 4L Corridor from Km 71.000 From Purvanchal Expressway to Km 102.000 Start of Ghazipur Zamania Saiyad Raja sec of NH24 TL 30 km in Uttar Pradesh
Const. of 4L GF corridor Ghazipur Zamania Saiyad Raja of NH24 Old NH97 with extens. up to Varanasi Ranchi Kolkata corridor Km 0.000 to Km 51.850 TL 51.850 km in
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from Km 0.000 to Km 77.102 (Chitrakoot Majhgawan Satna section) of NH 135BG (Desig
Develop. of 6L AC GF Regional Expressway on Northern side of Hyderabad from Pragnapur Vill Design Ch82.000 to Tangad Palle Vill Design Ch160.000 for a Design L
Devel. of 6L AC GF Regional Expressway on Northern side of Hyderabad from Girmapur Vill Ch1.518 to Pragnapur Ch.82.000 for a Design Length of 83.518 Km in Telan
Const.of 4L AC GF alignment of Southern bypass to Jhansi and CL for NH44 n NH39 from Km.16.920 of NH44 near Bangay khas vill.DC 0.030 and terminating forming T
4-Laning of Muzaffarpur- Sitamarhi- Sonbarsa section of NH-22 (Design Ch. Km. 0.000 to Design Ch. Km. 82.551 Total Length 82.551 Km) in the state of Bihar on Hy
Tolling Operation Maintenance and Transfer of Asanpur- Forbesganj- Purnea section of NH-27 in the state of Bihar (TOT Bundle-21)
Tolling Operation Maintenance and Transfer of Purnea Dalkhola Raiganj section of NH-27 and 12 in the state of Bihar and West Bengal (TOT Bundle-22)
Tolling Operation Maintenance and Transfer of Muzzafarpur- Darbanga- Asanpur section of NH-27 in the state of Bihar (TOT Bundle-20)
Rectification of Black Spot locations of Chutupallu Ghati from Ch. 92.885 to Ch.97.920 and Charahi Ghati Section from Ch. 51.540 to Ch. 52.500 on NH33 (New NH20
Six laning of Atkadih to Gorhar Section of NH 19 (Old NH 2) from Km 320.800 to km 326.160 in the State of Jharkhand on EPC Mode
Upgradation of the missing link of the Amritsar Jamnagar Economic Corridor between Maliya and Pipaliya section of NH151A (Length 24.2 km) in the State of Gujara
Six Laning of Gandhidham (Kandla) Mundra Port from km 0/000 to km 71/400 (Length 71.40 km) section of NH41 in the state of Gujarat on EPC.
CONSULTANCY SERVICES FOR PREPARATION OF DETAILED PROJECT REPORT (DPR) FOR CONSTRUCTION OF SECOND PARALLEL TUBE ADJACENT TO EXISTING NAGABASTI SINGLE TUBE TUNNEL
Const. of 4L from Kadur Km 256.530 to Hasnapur Potulamadugu Km 267.360 Mahabubnagar Bypass of Hyderabad Panaji sec of NH167 L 10.830km under NH O in the state o
Balance Works of 4 lane Bangalore Chennai Expressway from Arakkonam to Kancheepuram (Km 204.500 to Km 230.000) (Phase III/Package III) in Tamil Nadu on EPC Mode
Cons of 6L GF AC Indore Eastern Bypass from km 113.000 on NH 347BG near Simrol/Datoda end at km 139.630 Nanded PKG2 of Indore dist n Rehab n upgrade of exist NH
Construction of 6L GF AC Indore Eastern Bypass starting from DC KM 64.000 near Pirkaradiya village and ending at DC KM 113.000 on NH 347BG near village Simrol/D
CS for AE for Balance work for Construction of 8Lane Access Controlled Expressway from Km 128.0 to Km 154.6 of Vadodara Mumbai Expressway Karvad to Jujuwa Secti
Rehabilitation and Upgradation of exist 2L to 4L of NH146 from Km 0.000 Km 158.600 near Berkheri vill to Km 23.423 Km 181.800 near Lehdara vill in the State of
4L of Jagtial Karimnagar Section of NH 563 from Jagtial Bypass Start at Design Ch.0.000 Existing chainage 90.500 on NH63 to Design Ch.58.866 km near SH-1 Ch. 17
4L of Kolhapur Sangli sec of NH166 from Sangli Phata km 0.00 to Chokak km 7.738 n Chokak km 145.300 to Ankali km171.171 Length33.609 km in Maharashtra to be exe
Consultancy services for Independent Engineer for Construction of 4 lane elevated corridor including approaches from Old Pune Naka to Boramani Naka on NH 65 in
Closes 30 Sep 2026Portal ↗
Construction of De Scoped Length of Four Lane Bypass (NH 206) for Shivamogga City Project Length 4.74 Km from Km.209.76 to Km.214.5 (Design Chainage) under NH(O
Obaidullaganj Km. 2.800 to Km. 8.300 and Km. 20.700 to Itarsi Km. 63.000 of NH 69 Excluding Ratapani from Km. 08.300 to Km. 20.680 in the state of Madhya Prades
8 Lane Dwarka Expressway from Shiv Murti to RUB Delhi (Chainage from Km 0.600 to Km 5.300) in the state of Delhi (Package I / NH 248BB) 2nd Call Works to be car
Rectification of 25 no of Accident Spots Blackspots in Karur Dindigul Madurai Kayathar sec of NH44 Chettikulam Natham sec of NH785 and Const of Combined Office
Const of 4/6L GF Ludhiana Rupnagar NH 205K from Jn with NE to Manewal (Ludhiana) to Jn with NH205 near Bheora (Rupnagar) with Ludhiana bypass under NH(O) in Pun
Construction and Upgradation of existing 2L.PS to 4L with Paved Shoulder configuration from Km 0.000 (Tansen Chowk Purani Chhawani Gwalior) to Km 77.000 (Near V
Construction and Upgradation of existing 2L.PS to 4L with Paved Shoulder configuration from Km 77.000 (Near Village Prithvipur) to Km 116.200 (MP/UP Border near
Balance work for Construction of 8-lane access-controlled expressway from km 154.6 to Km 190.0 of Vadodara Mumbai Expressway (Jujuwa to Gandeva section) in Guja
Const of 6L LVUP SVUP in vil Sahuwala Km271.890n272.093 LVUPnSVUP in vil Odhan Km. 285.513n285.765 LVUP in vill Chormar Khera Km292.030 n LVUP in vil Sawant Khe
Construction of 03 nos. of 3 lane ROBs and 07 no of VUPs on 6L Delhi Agra Section old NH-2 (New NH 44 and 19) from Km. 20.500 to Km. 200.000 in the State of Har
Construction of 4lane GF Amritsar-Katra connectivity of Amritsar with DAK Expressway from MDR Junction at ch.40.900 Dhunda Village-Junction NH3 and Taran Taran
Construction of 2 ROBs (129A and 134A) on the bypassed section of Thiruvarur Town in the Nagapattinam Thanjavur Section of NH 83 in Tamil Nadu on EPC Mode
Balance work of Six laning of Kagal Satara section of NH 48 (old NH 4) Package I from km 592.500 to km 658.000 in the State of Maharashtra to be executed on EPC
Construction of Grade Separators at Sarona Chowk (Ch. 279.750) Udyog Bhawan (Ch. 269.000) Telibandha Chowk (Ch. 268.000) and Agrasen Chowk (265.500) in Raipur C
Development of Greenfield High-Speed Access Controlled Corridor from Shamli Gorakhpur from Ch. 212.600 to Ch. 274.000 in the State of Uttar Pradesh on HAM Mode
Development of Greenfield High-Speed Access Controlled Corridor from Shamli Gorakhpur from Ch. 274.000 to Ch. 348.039 in the State of Uttar Pradesh on HAM Mode
Development of Greenfield High-Speed Access Controlled Corridor from Shamli Gorakhpur from Ch. 348.453 to Ch. 422.500 in the State of Uttar Pradesh on HAM Mode
Upgradation from Intermediate 2-lane PS to 2-4 lane PS of Kharibari Ghoshpukur portion of NH-327C in the state of West Bengal on Hybrid Annuity Mode under NH(O)
Upgradation from 2-lane PS to 4-lane PS of Bagdogra Panitanki Kharibari Galgalia Section of NH-327 in the state of West Bengal on HAM Mode under NH(O)
Development of High-Speed Access Controlled Greenfield Corridor from Shamli Gorakhpur from Ch. 422.500 to Ch.466.000 in the State of Uttar Pradesh on HAM mode (
Development of Greenfield High-Speed Access Controlled Corridor from Shamli-Gorakhpur from Ch.143.100 to Ch.212.600 in the State of Uttar Pradesh on HAM Mode (P
Development of High-Speed Access Controlled Greenfield Corridor from Shamli-Gorakhpur from Ch. 510.700 to Ch.579.950 in the State of Uttar Pradesh on HAM mode (
Develop. of High Speed AC GF Corridor from Shamli Gorakhpur from Ch. 579.950 to Ch.662.400 in the State of Uttar Pradesh on HAM mode Package-11 Design Length 82
Departments buying this work
Other work in Nhai Hq
Everything here
Details here are copied from the portal that published each tender. Always confirm the deadline and documents on that portal before bidding.
