Manpower & Facilities tenders in Coal India & Subsidiaries
37 open manpower & facilities tenders in Coal India & Subsidiaries, the next closing 17 Sep 2026, 6 of them over ₹1 Cr. Updated every day.
Open all 37 in the search →Part of Coal India & Subsidiaries. Every listing below is manpower & facilities work only.
Open tenders
Haulage road cleaning in RVIIA seam at Chora Block Incline Colliery under Kenda Area ECL
Annual House keeping work of Sinidih
Day to Day Cleaning and Upkeeping of Project Office, Digital Dispensary, L and R Office, Prefab Accommodation, and Unit Store for 2 years under Amrapali OCP of
Withdrawing the old, worn out pipes from pumping borehole, Cleaning the jammed borehole and lowering and Fitting of new pipe in R-VI seam of no. B pit at pandav
Regular cleaning of static road weigh bridges at LNG-4 (Road sale coal stock) at LOCP, Lingaraj Area for a period of two years
Repairing and cleaning of radiator assy. Of Rhino ACE Crane Sl no-MC 684,MC685,MC-686,MC 706 of Gevra Project as per Scope of work.
Cleaning, testing and Calibration of 2000 nos. test weights for 02 nos. 60MT road weighbridges installed at Topa OCP under Kuju Area.
A)Dismantling,and erection of OHL and installation of 630KVA transformer at coal depot.B)Dismantling,shifting and erection of OH line at outsourcing patch and h
Washing painting and cleaning of Durga mandap, Chhat ghat, Kali mandir, Gurudwara, Tiru Fall and Church at Bachra under GM Unit, Piparwar Area.
Providing and fixing cover slab and cleaning existing drain from Lalkiband to main gate transformer at Dakaita under Rajmahal Area.
AMC for cleaning and Upkeeping of MTK, GVTC, Sales Office, Coal Sampling Office and establishment within its premises under GM Unit, Amrapali-Chandragupta Area,
Cleaning of OH Storage tank of residential quarter and welfare building of Rajrappa Colony under GM Unit Rajrappa Area
Repair and maintenance of external sanitary including annual cleaning upkeeping of Manikpur Colony at Manikpur OCP of Korba Area
Cleaning , Dismantling , Repairing and Assembling of 16 Nos. Radiator assembly of CAT179D 190T Dumpers at NWS Nigahi Project for the period of 02 Years.
Cleaning of old thickener tank at RWP for storage of fresh water under Rajrappa Washery Project
Cleaning of Jungles Bushes Debrises etc at RandR Site for upcoming visit under Basundhara Area
Day to day Cleaning Repairing and maintenance of Miners Qtr Colony Miners colony Departmental colony Chopra colony RTI Colony Police line colony Residential Bui
Day to day cleaning repairing and maintenance of Staff Qtr Colony 1B 1C JMQ DMQ near hospital DAV Colony B type DMQ Lal Maidaan Workshop colony Rescue colony Re
Repairing of Air conditioning system, repair, cleaning of radiator, radiator guard, radiator fan and its grill and side guards, 01 no. Tilt cylinder assy., lift
Regular cleaning of 8 nos weigh bridges
Heightening of roof and widening of gallery for installation of belt, re-support of gallery and malma cleaning ,dismantling and shortening of belt at Jhiria UG
Providing, cleaning and fixing of fluorescent sticker on HEMM and electric poles at Govindpur Phase-II OCP
Repairing and Cleaning of Radiator Assy of BEML BD355 Dozer Sl No. E12041, E12070, E-12067, E11888 and Motor Grader Sl no. 3160 of Kulda OCP Basundhara Area.
Comprehensive Annual maintenance for CETI for 02 years.
Comprehensive Annual Maintenance of Manki Colony for Two Years under Churi Project,NK Area.
Cleaning, painting and repairing of 2950 nos. of 20 KG CI test weight of 50Mt/60Mt capacity electronic road weighbridge at different location of AKKOCP
Belt Transporting, cable hanging , cleaning, jsdb 30 switch and cable , rope transporting and laying and other misc. in Moonidih colliery, W J Area
Cleaning travelling roadway 400MH , drain and remove old material from 400 MH Moonidih Colliery, W J Area
Cleaning in escape route from 500 MH main line to belt TC06 discharge of length 70 mts and in 3A rise from 500 MH mainline to TC07 belt drive of length 60 mtr a
Repair and Maintenance and Regular Cleaning of Public Road and CT Road Junction at various sites (DLB-1 Junction, Camp Road Junction and Main Time Office Ramp)
Operation and arrangment for distribution of drinking water supply from water filter plant to residential , service welfare buildings cleaning of Ground water s
Cleaning and Re-conditioning of 03 Nos. Radiator Assemblies of HEMM are working at Magadh OCP under M-S Area
General Upkeeping and sanitation work of coal workshop Premises, Coal substation ,E and M workshop, old Regional Store , VTC Coal analysis Lab, New Canteen ,CHP
Cleaning of spilled coal below tail end/discharge ends and cleaning of spilled coal below belt conveyor structures of 16LS,10LS,-16R and -9R LHCM panel of seam
Cleaning and removal of malma/loose coal for tail ends and discharge points of T-1, T-2, T-3 belt conveyor and 40 Ist, 40 IInd, 40 IIIrd, 40 IVth, 80 Ist belt o
EXPRESSION OF INTEREST FOR DEPLOYMENT OF LONGWALL TECHNOLOGY IN SPECIFIED COAL BLOCKS OF CIL
Closes 30 Sep 2026Portal ↗
Laying of haulage track line on both side track in underground, Side dressing and roof dressing with cleaning for preparation of haulage of haulage roadway for
Departments buying this work
- Central Coalfields Limited 13
- South Eastern Coalfields Limited 8
- Bharat Coking Coal Limited 4
- Mahanadi Coalfields Limited 4
- Eastern Coalfields Limited 3
- Northern Coalfields Limited 3
- Western Coalfields Limited 1
Other work in Coal India & Subsidiaries
- Electrical & Power 144
- Buildings & Civil 138
- Maintenance & AMC 90
- Roads & Bridges 44
- Water & Irrigation 38
- Vehicles & Transport 30
- Other 23
Everything here
Details here are copied from the portal that published each tender. Always confirm the deadline and documents on that portal before bidding.
