Compare your rates with the schedule
What your quoted percentage actually means against the department’s estimate, and whether the items that decide the job cover what they cost you. Runs in your browser; nothing is sent anywhere or stored.
The tender
What you have bid
| Estimate, after the cost index | — |
| Your contract value | — |
Load your schedule of rates
This page does not carry the DSR, and deliberately so — CPWD’s schedule and the state SORs are priced publications, and the edition that governs your job is the one your tender names. Load your own copy instead: paste it from Excel or choose a CSV. It is parsed in your browser, kept in this browser only, and remembered next time so you load it once.
Which column is which
Bring in your own BOQ
Open the bill of quantities in Excel, select the columns you want and paste them below — or choose a CSV file. It is read in your browser: there is no server behind this page, so a priced BOQ never leaves your computer.
Which column is which
Your biggest items, against the schedule
Three or four items decide most jobs. Put in the schedule rate from the edition your tender names, what the work actually costs you, and the quantity. The gap column applies your cost index and quoted percentage to the schedule rate, then compares it with your cost. The item box suggests common BOQ items as you type, and takes anything you type instead — the description that governs is the one in your tender.
| Code | Item | Schedule rate | Your cost | Qty | Gap | On this item |
|---|---|---|---|---|---|---|
| Across the items you have priced | — | |||||
Before you rely on this
- This does not contain the schedule. It cannot: rates move between editions, and the edition named in your tender is the only one that counts. An estimate prepared on one edition and a bid priced from another are two different sums of money, and the difference is yours to absorb. Take the rates from the schedule your tender names.
- “DSR” may not mean CPWD’s DSR. State PWDs publish their own schedules on their own cycles, and a municipal body or PSU may use something else again. The tender document says which — assume nothing from the abbreviation.
- Read what the rate is deemed to include — carriage, dewatering, disposal, curing. A schedule rate that looks generous often is not once you read the description.
- Check the quantities against the drawings. In a percentage-rate contract an understated quantity is not a variation you can price later.
- The background is in the CPWD DSR and schedules of rates, and the full bid arithmetic in pricing a small works tender.